Skip to content

Project gallery

Siphonic Project Gallery

Our siphonics projects

Welcome to the West Siphonics project gallery. We’re roof drainage specialists providing a one-stop solution for the design, manufacture, installation, and project management of the most advanced siphonic roof drainage systems.

Please take a look through our project gallery and contact us if you wish to know more about any of the siphonic projects we’ve completed. Follow us on Facebook and Linkedin to see more of our siphonic projects.

Project Gallery 1
West Siphonic Systems Lutterworth 7

Lutterworth.

Back in July 2023, West Siphonics Systems were appointed to design, supply & install the Siphonic rainwater drainage to a new development in Lutterworth. The project comprised of 3 Nr large warehouses equating to a vast gross internal area of over 56,000m2 or, 603,000 square feet in old money!

READ MORE
West Siphonics Systems Magna Park Corby Syphonic Drainage Systems 5

Magna Park Corby.

Magna Park Corby is one of the UK’s largest dedicated logistics and distribution parks. The MPC2 and MPC3 site contains two smartly dressed warehouses, each with over 590,000 square foot of floor space.

READ MORE
West Siphonic Systems Doncaster Panattoni Park 2

Doncaster Panattoni Park.

West Siphonics Systems Ltd were awarded the contract to design, supply, and install the siphonic rainwater drainage systems to a new distribution warehouse at Panattoni Park in Doncaster, South Yorkshire.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Mercia 5

Project Mercia.

West Siphonics Systems were appointed by Winvic Construction to design, supply & install the Siphonic drainage to all 5 Units. This 238-acre development will be home to Jaguar Land Rover, making this the UK’s largest single occupier logistics park.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Logistics Operation Centre, Solihull.

This impressive site contains a 1,000,000 square foot warehouse and a multi-storey staff car park. The main warehouse roof consists of 2 eaves gutters & 14 valley gutters, the roof is also hip ended. The total roof area is approximately 91,950 m2, based on the specified rainfall intensity and geographical location of the project, this equates to a staggering 5,300 litres of rainwater per second.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Vaccine-Production-Facility-Fast-Tracked

Vaccine-Production Facility, Oxford.

West Siphonics has been selected to develop the Siphonic Roof drainage scheme for the new Vaccines Manufacturing Centre in Didcot, Oxford. This state-of-the-art building will benefit from our industry leading design with both Primary and Secondary siphonic rainwater drainage systems offering the greatest protection to the building and its invaluable contents.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Plot 2, Project Hive, East Midlands Gateway.

Measuring a whopping 450m long, this is the largest unit of a trio on this site that West Siphonics have provided Siphonic roof drainage to. The design consisted of primary and secondary systems which discharged the large volume of rainwater to each end of the building.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Magnitude, Milton Keynes.

This impressive site is hard to miss as it is situated right beside the M1 Jct13 – Jct14. This is the latest of several units West Siphonics have had the pleasure of providing rainwater drainage to on this site.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Nickel 28, Mansfield.

A 261,000 sq ft distribution/industrial facility strategically located 1 mile from junction 28 of the M1. The 234m long warehouse was siphonically via downpipes located at only one end of the warehouse, drastically reducing the amount of underground drainage required.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Baytree, Dunstable.

A cutting edge development. West Siphonics modelled 2,500m of siphonic pipework in 3D to produce a working BIM model for the whole of the design team to aid co-ordination.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management IPORT 2

iPort, Doncaster.

A 1.1 million sq ft logistics centre for iPort. West Siphonics designed, supplied, and installed over 8.2km of pipework to drain 7,400 litres per second from this mega-shed.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Dirft Rugby

DC3, Daventry.

Read more about the DC3, Daventry project.


READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Peterborough Actual Project is Smart Garden

Plot 100, Peterborough.

Read more about the Plot 100, Peterborough project.



READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Corby Plot 1

Plot 2, Corby.

Measuring a whopping 450m long, this is the largest unit of a trio on this site that West Siphonics have provided Siphonic roof drainage to. The design consisted of primary and secondary systems which discharged the large volume of rainwater to each end of the building.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Castle Donington Emg, Plot 12 – Project Triathlon 2

Castle Donington, Plot 12 – Project Triathlon.

Project Triathlon is plot No. 12 on the EMG (East Midlands Gateway) site in Castle Donington. The project consists of a 35m tall high bay warehouse and a 20m tall low bay warehouse.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management ICON 2 Manchester Airport 2 Project Gallery

Icon 2 – Unit 2, Manchester Airport.

ICON 2 is strategically located at Manchester Airport City in close proximity to the World Freight Terminal. The 260m long warehouse is drained via Primary downpipes located at one end of the building.

READ MORE
West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

V&A, Dundee.

The stunning V&A Museum Dundee stands partly on the banks of the mighty River Tay, and partly in the River Tay. The iconic building is the work of award-winning Japanese architects Kengo Kuma & Associates, and was designed as a way of reconnecting the city to its historic River Tay waterfront.

READ MORE