Project Triathlon is plot No. 12 on the EMG (East Midlands Gateway) site in Castle Donington. The project consists of a 35m tall high bay warehouse and a 20m tall low bay warehouse. All roof areas are drained via primary and secondary siphonic drainage systems.
Below are some project-specific statistics;