Nickel 28, Mansfield

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Nickel 28, Mansfield

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

A 261,000 sq ft distribution/industrial facility strategically located 1 mile from junction 28 of the M1. The 234m long warehouse was drained via downpipes located at only one end of the warehouse, drastically reducing the amount of underground drainage required.

The development consists of the following:

  • 261,000 square feet of warehousing
  • A total of 1,471 metres of siphonic drainage installed

Magnitude, Milton Keynes

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Magnitude, Milton Keynes

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

This impressive site is hard to miss as it is situated right beside the M1 Jct13 – Jct14. This is the latest of several units West Siphonics have had the pleasure of providing rainwater drainage to.

The development consists of the following:

  • 584,738 square feet of warehousing
  • A total of 4,978 metres of siphonic drainage installed

Plot 2, Corby

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Corby Plot 1

Plot 2, Corby

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Corby Plot 1

Measuring a whopping 450m long, this is the largest unit of a trio on this site that West Siphonics have provided Siphonic roof drainage to. The design consisted of primary and secondary systems which discharged the large volume of rainwater to each end of the building.

The development consists of the following:

  • 893,404 square feet of warehousing
  • A total of 8,417 metres of siphonic drainage installed
  • 12 week programme

Plot 100, Peterborough

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Peterborough Actual Project is Smart Garden

Plot 100, Peterborough

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Peterborough Actual Project is Smart Garden

West Siphonics Systems designed manufacture and installed Primary and Secondary roof drainage systems to 4 logistics Units at the Peterborough Gateway development.

The development consists of the following:

  • 942,554 square feet of warehousing
  • A total of 7,184 metres of siphonic drainage installed across 4 plots
  • Combined capacity to drain a total rainfall intensity of 5,590 l/s

Amazon, Doncaster

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management IPORT Amazon

Amazon, iPort, Doncaster

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management IPORT Amazon

A 1.1 million sq ft logistics centre for Amazon. West Siphonics designed, supplied, and installed over 8.2km of pipework to drain 7,400 litres per second from this mega-shed.

The development consists of the following:

  • 1.1 million square feet of warehousing
  • A total of 8,222 metres of siphonic drainage installed
  • 11 week programme

DC3, Daventry

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Dirft Rugby

DC3, Daventry

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management Dirft Rugby

West Siphonics Systems successfully completed the design, manufacture and installation of the siphonic systems at the Dirft Rail Freight and Logistics Park.

The development consists of the following:

  • 532,000 square feet of warehousing
  • A total of 5,200 metres of siphonic drainage installed
  • 9 week programme

Baytree, Dunstable

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Baytree, Dunstable

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

A cutting edge development. West Siphonics modelled 2,500m of siphonic pipework in 3D to produce a working BIM model for the whole of the design team to aid co-ordination.

The development consists of the following:

  • 266,947 square feet of warehousing
  • A total of 2,523 metres of siphonic drainage installed

Plot 2, Project Hive, East Midlands Gateway

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

Plot 2, Project Hive, East Midlands Gateway

West Siphonics Systems England Scotland Siphonic Roof Drainage Specialists Design Manufacture Installation Project Management

West Siphonics have successfully designed manufactured and installed the rainwater management systems for Plots 1 – 4 at the East Midlands Gateway development.

The development currently consists of 4 distribution facilities with unit five underway.

The development consists of the following:

  • 2.6 million square feet of warehousing
  • Combined roof areas - 1,880,713 sq.ft
  • A total of 17,500 metres of siphonic drainage installed
  • A total of 10,316 l/s drained, enough water to fill one Olympic swimming pool in 4 minutes